SUNSET-ATHENS CONNECTOR ROAD
REVISED DRAFT ENVIRONMENTAL IMPACT REPORT
NOTE: Adobe Acrobat Reader is required to view the files below.
DOCUMENT: LAST UPDATED - 07/16/2009 10:13 AM
COVER / TITLE
TABLE OF CONTENTS
SECTION 1.0
SUMMARY
SECTION 2.0
INTRODUCTION
SECTION 3.0
PROJECT DESCRIPTION
SECTION 4.0 - ENVIRONMENTAL ANALYSIS
4.1 Introduction to Environmental Analysis
4.2 Land Use and Planning
4.3 Transportation and Circulation
4.4 Hazards and Health Safety
4.5 Noise
4.6 Geology and Soils
4.7 Hydrology and Water Quality
4.8 Biological Resources
4.9 Air Quality
4.10 Cultural Resources
4.11 Utilities and Service Systems
4.12 Aesthetics
SECTION 5.0
ANALYSIS OF ALTERNATIVES
SECTION 6.0
OTHER CONSIDERATIONS
SECTION 7.0
EIR AUTHORS, CONSULTANTS, PERSONS/ORGANIZATIONS CONSULTED
SECTION 8.0
BIBLIOGRAPHY
FIGURES:
SECTION 3
3-1 Regional Location
3-2 Proposed Road Alignment
3-3 Proposed Road Right-of-Way and Surrounding Parcels
3-4 Site Plan Sections A and B
3-5 Site Plan Sections C, D, and E
3-6 Site Plan Sections F and G
3-7 Preliminary Bridge Design
3-8 Channel Bypass and Bridge Placement
SECTION 4
4.2-1 Panoramic Views from Well Site - Looking South and West
4.2-2 Panoramic Views from Well Site - Looking North and East
4.2-3 Existing SIA Plan Designations
4.2-4 Sunset Industrial Area Map
4.2-5 Existing Zoning
4.3-1 Roadways in the Project Vicinity
4.3-2 Existing Traffic Volumes and Lane Configurations
4.3-3 Proposed Traffic Diversions Existing Conditions
4.3-4 Existing Plus Projects Traffic Volumes and Lane Configurations
4.5-1 Effects of Noise on People
4.6-1 Soil Types
4.7-1 Drainage Map
4.7-2 FEMA 100-Year Floodplain Map
4.8-1 Delineation of Waters of the United States
4.8-2 Freshwater Marsh Habitat
4.8-3 Vernal Pool Habitat and Ornamental Trees
SECTION 5
5-1 Aerial View of the Project Site and Alternative Road Alignments
SECTION 6
6-1 Cumulative No Project Traffic Volumes and Lane Configurations
6-2 Cumulative Plus Project Traffic Volumes and Lane Configurations
APPENDICES:
Table of Contents
A Notice of Preparation, Initial Study, Scoping Meeting Notice and Minutes, and Public Comments
B Memorandum of Understanding between Placer County and United Auburn Indian Community
C Sunset-Athens Connector Traffic study
D Sunset-Athens Connector Road Phase 1 Environmental Site Assessment
E Geotechnical Reports
F Drainage Study: Thunder Valley Station Casino Off-Site Improvements
G Special Status Species Lists
H Biological Resources Permits
I Air Quality Emissions Calculations
J Letter from State Historic Preservation Officer
K Project Site Grading Plans
This Document Was Created By:
AES - Analytical Environmental Services 1801 7th Street, Suite 100 Sacramento, CA 95811 Phone (916) 447-3479 Fax (916) 447-1665 www.analyticalcorp.com